Current Roadway Construction and Maintenance

This page will be updated as projects are added.  Start/Completion dates are for general reference only and are subject to change.

CRP 837

Replacement of the Sullivan Lake Inlet Bridge

Construction planned summer of 2018

Design
Construction
CAPP 2017

CAPP 2017 Pavement Preservation. Includes pre-level and chip seal.

Design
Construction
Striping Program

Centerline and edge striping. Approximately 100 miles County wide. Includes stop bars and cross walks.

Design
Field Work
SP-121 Indian Creek Culvert Elimination

Construction Planned for Summer of 2018. Currently in R.O.W. and permitting phase.

Design
Construction
CRP-839 Leclerc Rd South Intersection Improvement with Sandy Shores Rd

Construction Planned for Summer of 2018. Currently in R.O.W. and permitting phase.

Design
Construction
2017 Gravel Road Stabilization Program

Includes calcium chloride and magnesium chloride treatments for stabilization of at risk road segments. Locations to be determined, approximately 6 miles County wide. Planned for early summer of 2017.

Design
Field Application
2017 Right of Way Vegetation Control Program

Starting Spring through Fall 2017. Work includes spraying, shoulder mowing and brush cutting. Land owners may opt out for spraying, please see our Vegetation Control page. Work is County wide.

Design
Field Work
2017 Bridge Inspection Program

Includes 25 routine bi-annual inspections and 15 load rating analysis on County owned structures. Fracture critical inspection of the Ione Bridge is scheduled for mid August, and delays are possible during the contracted work.

Design
Inspections